Walmart Distribution Center Driveway Lift Case Study

Wal-Mart distribution center has a gate area with over 75 concrete pads sinking within a 10,000 square foot area holding 4 lanes for tractor trailers.

Project is awarded at beginning of pandemic when distribution is a high priority for the country. Only 1 lane may close at a time.


Approach:

Ram Jack cones off one lane at a time addressing each pad to lift and secure before clean up and lane transition. Foam will cure within 30 minutes allowing traffic back to the lane directly after clean up.


Outcome:

Ram Jack brought the area back to level without disrupting daily activities. Installation was completed within 2 days saving major time, money, and headache of ripping and replacing the pads.