Garage Poly Foam Case Study

Ram Jack identified typical settling in a 2-car garage of over 3 inches; however, this one has had repair done in a section and there are several spider cracks throughout.



Approach:

Ram Jack injects at the lowest end to secure loose soils and fills voids evenly under slab before beginning the lift. Lifting points are chosen to uniformly lift original and repaired sections.


Outcome:

Ram Jack achieved full recovery within 2 hours. The customer saved time and money while enjoying the “magic show” of lifting concrete with Polyurethane Foam. Watch the concrete lift below.