Preserve at Jordan Lake HOA Sidewalk Repair Case Study
Over 40 tripping hazards have been observed within the Preserve at Jordan Lake's community sidewalks that need to be addressed.
Approach:
The crew approaches every situation with speed and accuracy; Lifting, documenting, and cleaning each site.
Outcome:
Ram Jack utilizes efficient strategies to tackle each trip hazard within a 20 minute window to complete the entire project with 1.5 days. HOA saves money and avoids having new concrete that will not match aesthetics with rip and replace.