top of page

Preserve at Jordan Lake HOA Sidewalk Repair Case Study

Over 40 tripping hazards have been observed within the Preserve at Jordan Lake's community sidewalks that need to be addressed.




Approach:

The crew approaches every situation with speed and accuracy; Lifting, documenting, and cleaning each site.



Outcome:

Ram Jack utilizes efficient strategies to tackle each trip hazard within a 20 minute window to complete the entire project with 1.5 days. HOA saves money and avoids having new concrete that will not match aesthetics with rip and replace.

3 views0 comments

Recent Posts

See All
bottom of page